MCCOY FEDERAL OFFICE
BUILDING RENOVATION –
JACKSON, MI
Our cost team supported the lead designer during the competition phase to successful conclusion and then through all design phases on this high-profile, iconic project, which included never- before tested complex sustainable design solutions. The physical site consisted of demolition and reclamation of an industrial complex and the creation of extensive sustainable bio-habitats, walks and water features that all ultimately contributed to the provision of sustainable energy features for the final Embassy structure.
Our Services – Budget setting
Cost Estimating from concept to CD
Client: KieranTimberlake
Project size: 518,050 GSF
Concept estimate: NA
Construction finish date: Q1 2018
Site area: NA
Number of stories (Level): 12 stories
Contact: Andrew Smith – Managing Director |
+1 862 208 8206 | asmith@dharamconsulting.com