
The project
Situated on designated wetlands, the Rouses Point Land Port of Entry includes a new 13,140 SF facility with a train platform and connector bridge, serving as one of only three international rail passenger crossings in the U.S. The project emphasizes sustainability, minimizing disturbance to the surrounding wetlands while delivering an all-electric, net-zero–ready facility featuring geothermal heating and cooling and mass-timber construction to reduce embodied carbon.





